The scope of work will require the east driveway being shut with the duration of construction which is expected to conclude early March 2021. Ambulance targeted traffic will continue on to have access to the FSED via the west driveway on East Bay Drive. Make sure you be advised that https://linktr.ee/rjmurphyconsca