An item, system, or system audit could have conclusions that need correction and corrective action. Since most corrective actions can't be carried out at enough time of the audit, the audit plan manager may well need a follow-up audit to verify that corrections ended up built and corrective steps were https://chandrad456mjg4.salesmanwiki.com/user