The final practice run was hauled by the exact same locomotive that ran the initial service (no.one in 1896 was the primary engine to steam into Queenstown). The rail and various movable objects were lifted taken off-web-site, leaving a lot of the bridges intact. This was previous to the opening https://jamesr451ded7.wikijournalist.com/user